Constrcution of Br. No. 8B (2x24.4m CG) in connection with Railway Works of Paradip E.Cn Quary Terminal Pvt Ltd (PEQCTPL) at Paradip Port Odisha
Project image not available
COMPLETED
PROJECT DETAILS
Girder works — 2 x 24.0m CG.
Girder work scope: 2 x 24.0m CG. Location: Paradip Port Odisha. Executed for agency: M/s K.K Engineering.
Remarks: Complete
Technical Information
| Status | Completed |
|---|---|
| Project Type | Railway Bridge |
| Client / Agency | M/s K.K Engineering |
| Location | Paradip Port Odisha |
| LOA / Reference | PEQCTPL/Railway Works/20-21/250920, Dtd-25.09.2020 |
| Girder / Work Type | Composite Girder |
| Span / Quantity | 2 x 24.0m CG |
| Weight | 110.424 MT |
SIMILAR REQUIREMENT?